66 Nearwater Ave

Master Bathroom

The problem below is the lopsided look of the tower. Nothing closes completely or straight. When Ambassador mens came to look, they said the tower was faulty.

I called Pete at Crown. He put me intouch with Sean 631-921-1322 at Aristocrat (cabinetry rep). Sean came with level. Determined tower needs to be shimmed up on the left. Says he will replace the tower if itis faulty but believes the installation was the problem.

tower

Sean indicated that a kickplate should be installed here.

kickplate

Corners are settling -- need to be grouted.

needs grout

There is a reason the marble is cut differently at one end. You can see the top piece was installed correctly with rounded corners to the outside, flat edge to wall. The lower piece was installed incorrectly. Besides the unprofesional look, it is a mildew farm.

marble seat

Master Bedroom

Lots of nailpops, tape peeling, wall cracking. For example:

crack in wall

tape peeling

sample nail pops

The baseboards look nicer with a supplied seam cover.

baseboard

Hallway Bathroom

This light is hanging above the shower.

hanging light

Grout is washing away.

grout

Attic

Attic fan went kaput -- image not available.